Work out how much ready-mix concrete you need, understand which mix suits your job, and request a quote.

Thank you for reading this post, don't forget to subscribe!
10%
Estimated concrete needed
0.00 m³
Raw volume
0.00 m³
With wastage
0.00 m³
25kg bags (approx)
0

Estimate only, rounded up to a standard 0.25 m³ order increment. Confirm minimum load charges and exact pricing with your supplier.

Which concrete mix do I need?

GradeTypical use
C10 / C15Blinding, non-structural fill, bedding for kerbs and paving
C20General-purpose domestic work, garden paths, edging
C25Domestic floor slabs, footings, patios
C30Driveways, garage floors, external paving subject to vehicle loads
C35Structural foundations, heavier-duty commercial bases
C40Heavy-duty industrial floors and structural commercial work

These are general UK industry grade classifications for guidance only. For any load-bearing or structural element, confirm the exact mix design with a structural engineer and your supplier before ordering.

Delivery & ordering — what to expect

Truck capacity

A standard ready-mix truck typically carries around 6m³. Larger pours may need multiple loads or a pump, which most suppliers can arrange.

Site access

Trucks need reasonable width, headroom and turning space to reach the pour location. Tight or restricted access should be flagged when you order.

Lead time

Ready-mix is usually ordered a day or two ahead, though this varies by supplier and demand — confirm current lead times when you enquire.

Weather

Very hot, cold or wet conditions can affect curing and placement. Your supplier can advise on additives or timing if conditions are marginal.

Frequently asked questions

Most jobs allow 5–10% for spillage, uneven ground and formwork tolerance — this calculator defaults to 10%, which you can adjust above.
Most ready-mix suppliers apply a minimum load charge, often somewhere around 1–1.5m³. Exact minimums and small-load surcharges vary, so confirm with your chosen supplier.
As general guidance: light foot traffic after roughly 24–72 hours, light vehicles after about a week, and full design strength typically around 28 days — always confirm timings for your specific mix with the supplier.
Yes, pumping is common where access is difficult or the pour is some distance from where the truck can park. Ask your supplier whether pumping is available and what it costs.